Case Study – How Steam Trap Monitoring Helped a Large Process Industry Save 20,000 Litres of Water

Steam trap Monitoring

Challenge

A large process industry in India faced the following issues across their facilities.

  • Each facility has 100 to 500 steam traps distributed across the plant
  • Manual testing done on each steam trap once in a few months (best case scenario)
  • On an average 10% to 20% of steam traps fail each year

Solution

  • As a pilot 50 steam traps were installed with the IoT based monitoring system.
  • Since these modules are battery powered each of the installation took less than 15 minutes.

Impact

Reduced Delay In Fixes

Real-time alerts sent to the end users when the system detects a variation from the standard inlet and outlet temperatures of the steam trap.

Cost Savings

  • After installation 20,000 litres of boiler make up water saved per month.
  • Rs 25,000 saved per month as boiler energy costs

Sensomak

We focus on helping your manufacturing and commercial facilities improve productivity and sustainability through digital solutions.

Newsletter

Sign up to receive the latest news and trends from our company.

More questions? Get in touch